This project was given special recognition with it being the 100th CREP project completed in Iowa. The construction involved using sheet pile weir outlets and drawdown structures to create a wetland consisting of both deep and shallow water and re-laying drainage district tiles. Click the link below to view a short clip of installing the sheet piling.
Click the link below to view the aerial inspection of the north end of the Main Ditch.