BUENA VISTA COUNTY CREP WETLAND
This project was given special recognition with it being the 100th CREP project completed in Iowa. The construction involved using sheet pile weir outlets and drawdown structures to create a wetland consisting of both deep and shallow water and re-laying drainage district tiles. Click the link below to view a short clip of installing the sheet piling.
JOINT CLAY, DICKINSON & EMMET DD#61 DITCH CLEANOUT
Click the link below to view the aerial inspection of the north end of the Main Ditch.